Home
Über uns
RNV
ZAR
TNV
KNV
Wärmerückgewinnung
Gebrauchtanlagen
Service
Linksammlung
Kontakt
Impressum

Consulting

Under the aspect of the Energy management we support the client on his request by studying potentially too high energy consumptions at existing plants, compare it to “up to date” achievable data and make a concept for lowering the energy consumption.

We consult you for the improvement of the drying capacity and the minimization of energy input at existing or new flow dryers in the coating industry. Targeting on a minimum exhaust air flow per drying system leads to a smaller exhaust air cleaning plant which operates at a higher solvent concentration and by this has a higher economic efficiency.

The Selection of the plant technology for getting the best possible and most economic solution depends of various and different Criteria and Factors dependent on the location:


  •  Exhaust air volume
  •  Exhaust temperature
  • Quantity of pollutant: Kind, mix, concentration
  •  Other pollutants
  •  Solvent purchase cost / Solvent recovery cost
  •  Energy cost / Recovery of excess energy into the production process
  •  Mode of operation (Number of shifts or permanent operation)

Moreover duties by law have to be followed:
  •  In the EC: “Councel Directive 1999/13/EC” from 1999
  •  In Germany: Technische Anleitung (TA) - Luft
  •  Deutschland: 31. Verordnung zum Bundes-Immissionsschutzgesetz (so-called „31. BImSchV") aus 2001
  •  Additional conditions set up by local authorities

Please ask us – we are happy to meet you!